Scope with confidence
Clear choices before production.
- The starting scope covers one visual direction and two minor revision rounds; structural, electrical, fire, acoustic, or site-driven redesign is separately quoted.
- No certification, room-level acoustic outcome, or installation compliance is implied until the relevant professionals approve the final specification.
- Qualified professionals must approve the wall support, fire strategy, acoustic claims, driver access, low-voltage LED system, and all fixed electrical work.
