Custom brief · Room first

Show the surface, power, circulation, and darkness the object must work with.

Share dimensions, substrate, site images, intended atmosphere, power location, budget, deadline, and the professionals responsible for installation approvals.

What makes a useful brief

Measure what the camera crop leaves out.

  • Wall, ceiling, table, or floor dimensions in millimetres
  • Wide site images with a scale reference and nearby furniture
  • Power location, cable route, and intended service access
  • Substrate, circulation, public access, and ambient light
  • Architect, electrician, installer, or acoustic consultant where relevant
  • One accountable proof approver and realistic delivery window
Protected verification activates on the hosted storefront.