Scope with confidence
Clear choices before production.
- The starting scope includes one pilot concept and two minor revision rounds; additional tiles, geometry families, and site changes are quoted separately.
- Final module count, rail design, driver capacity, and access clearances require verified site information.
- A qualified electrician must approve driver location and any fixed electrical connection; only approved low-voltage LED modules may be enclosed.
