Scope with confidence
Clear choices before production.
- The starting scope includes one cluster layout proof and two minor revision rounds; relocated ceiling points or additional pendants change the quote.
- Ceiling structure, wiring, load support, fire requirements, and on-site installation are excluded unless explicitly itemized.
- A qualified electrician must verify the ceiling, support, driver, earthing where applicable, and every fixed electrical connection before installation.
